TITLE 24 IN BURBANK
Title 24 energy reports
in Burbank.
Title 24 energy calculations for Burbank homes, ADUs, additions, and alterations. Email your plans for a written quote and confirmed turnaround.

Careful energy-report preparation for your Burbank plans.
LRG prepares energy reports around your actual project: the scope of work, orientation, existing conditions, proposed construction, windows, and equipment. We confirm price and turnaround after reviewing the plans.
Start with the local resources.
Burbank’s plan-check resource explains review and recheck coordination and where applicants can find reviewer information. City permit-review timing is separate from LRG’s report-production schedule.
Official city resource. Review the current instructions for your property and application.
A detail to include in your email
Include your report deadline and distinguish it from the city’s permit or construction milestone.
Before you send the plans.
Does a next-day energy report mean next-day city approval?
No. Rush service, when confirmed, applies to our report work. The city manages its own permit review. Tell us the date you need the report so we can confirm whether the requested schedule is available.
What should I send to get started?
For every service, send the full project address, scope of work, complete floor-area breakdowns, site plan, fully dimensioned floor plans drawn to scale with a window and door schedule or size callouts, exterior elevations of all sides, and cross sections. Include structural drawings if available; otherwise, structural member sizes used in our calculations will be estimated based on experience. Include any specified or preferred window U-factor and SHGC values, insulation R-values, HVAC size and type, and water-heater size and type. View the complete plan checklist →
Do you guarantee approval of the report?
Yes. We guarantee approval of the Title 24 report. Plan-check corrections are included when they are not caused by changes to the plans originally reviewed. Design changes may be required to achieve energy compliance and registry approval. The guarantee covers the Title 24 report, not approval of the entire project or issuance of a building permit.
ALWAYS HAPPY TO HELP
Let’s move your project forward.
Send your Burbank plans. We’ll take it from there.
Email your plans