TITLE 24 IN CHINO

Title 24 energy reports
in Chino.

Energy reports for your Chino home, ADU, or addition. Start with useful local permit resources, then send your plans for a clear written quote.

Illustrative California residential architecture
Architectural concept

Clear energy reports for your Chino project.

LRG prepares energy reports around your actual project: the scope of work, orientation, existing conditions, proposed construction, windows, and equipment. We confirm price and turnaround after reviewing the plans.

Start with the local resources.

Chino’s Development Services Permitting Process page separates building permit guides from planning information and lists contacts for both divisions. Start with the guide that fits your scope, then align the drawings and supporting energy documents before submission.

Chino — Development Services Permitting Process

Official city resource. Check the current instructions for your property and application.

A detail to include in your email

For a new home or ADU, include complete window and door sizes plus HVAC and water-heater information.

Upload your plans for a quote

Before you send the plans.

Can I start a Chino project entirely by email?

Yes. LRG handles project intake and report coordination online. Email your plans and project details, and we’ll confirm the report scope, price, and schedule in writing.

What should I send to get started?

For every service, send the full project address, scope of work, complete floor-area breakdowns, site plan, fully dimensioned floor plans drawn to scale with a window and door schedule or size callouts, exterior elevations of all sides, and cross sections. Include structural drawings if available; otherwise, structural member sizes used in our calculations will be estimated based on experience. Include any specified or preferred window U-factor and SHGC values, insulation R-values, HVAC size and type, and water-heater size and type. View the complete plan checklist →

Do you guarantee approval of the report?

Yes. We guarantee approval of the Title 24 report. Plan-check corrections are included when they are not caused by changes to the plans originally reviewed. Design changes may be required to achieve energy compliance and registry approval. The guarantee covers the Title 24 report, not approval of the entire project or issuance of a building permit.

ALWAYS HAPPY TO HELP

Let’s move your project forward.

Send your Chino plans. We’ll take it from there.

Email your plans