TITLE 24 IN IRVINE

Title 24 energy reports
in Irvine.

Title 24 reports for Irvine new homes, additions, ADUs, and residential alterations. Clear pricing and project coordination by email.

Architectural concept of a desert midcentury home with native landscaping
Architectural concept

Keep your Irvine energy report in step with your plans.

LRG prepares energy reports around your actual project: the scope of work, orientation, existing conditions, proposed construction, windows, and equipment. We confirm price and turnaround after reviewing the plans.

Start with the local resources.

Irvine’s Building Permits and Inspections page directs applicants to the city’s permit and plan-check resources, including IrvineReady. Coordinate the latest architectural drawings and energy documents before submitting your package.

Irvine — Building Permits and Inspections ↗

Official city resource. Review the current instructions for your property and application.

A detail to include in your email

Identify which drawings are current, and send the window and equipment specifications that correspond to that set.

Before you send the plans.

Can you work from revised Irvine plan sets?

Yes. Send the latest dated set and describe what changed. Include any previous energy report so we can identify the correct scope and confirm the price for review or revision work.

What should I send to get started?

For every service, send the full project address, scope of work, complete floor-area breakdowns, site plan, fully dimensioned floor plans drawn to scale with a window and door schedule or size callouts, exterior elevations of all sides, and cross sections. Include structural drawings if available; otherwise, structural member sizes used in our calculations will be estimated based on experience. Include any specified or preferred window U-factor and SHGC values, insulation R-values, HVAC size and type, and water-heater size and type. View the complete plan checklist →

Do you guarantee approval of the report?

Yes. We guarantee approval of the Title 24 report. Plan-check corrections are included when they are not caused by changes to the plans originally reviewed. Design changes may be required to achieve energy compliance and registry approval. The guarantee covers the Title 24 report, not approval of the entire project or issuance of a building permit.

ALWAYS HAPPY TO HELP

Let’s move your project forward.

Send your Irvine plans. We’ll take it from there.

Email your plans