TITLE 24 IN ORANGE

Title 24 energy reports
in Orange.

Title 24 energy calculations for Orange homes, ADUs, additions, and alterations. Email your plans for a written quote and confirmed turnaround.

Architectural concept of a welcoming backyard ADU
Architectural concept

Careful energy-report preparation for your Orange plans.

LRG prepares energy reports around your actual project: the scope of work, orientation, existing conditions, proposed construction, windows, and equipment. We confirm price and turnaround after reviewing the plans.

Start with the local resources.

The City of Orange’s Building and Safety Services page directs permit applications through its Civic Portal. Use the city’s current guidance to coordinate the application and supporting plans.

Orange — Building and Safety Services ↗

Official city resource. Review the current instructions for your property and application.

A detail to include in your email

Include the city name and any project number with your plans and existing energy documents.

Before you send the plans.

How do I identify a project in the City of Orange?

Include the street address and reviewing agency. The City of Orange is one jurisdiction within Orange County; this information helps us keep the project and its correspondence correctly identified.

What should I send to get started?

For every service, send the full project address, scope of work, complete floor-area breakdowns, site plan, fully dimensioned floor plans drawn to scale with a window and door schedule or size callouts, exterior elevations of all sides, and cross sections. Include structural drawings if available; otherwise, structural member sizes used in our calculations will be estimated based on experience. Include any specified or preferred window U-factor and SHGC values, insulation R-values, HVAC size and type, and water-heater size and type. View the complete plan checklist →

Do you guarantee approval of the report?

Yes. We guarantee approval of the Title 24 report. Plan-check corrections are included when they are not caused by changes to the plans originally reviewed. Design changes may be required to achieve energy compliance and registry approval. The guarantee covers the Title 24 report, not approval of the entire project or issuance of a building permit.

ALWAYS HAPPY TO HELP

Let’s move your project forward.

Send your Orange plans. We’ll take it from there.

Email your plans