TITLE 24 IN SAN DIEGO
Title 24 energy reports
in San Diego.
Remote Title 24 service for San Diego residential projects, with a written quote and a report prepared around the details in your plans.

Energy calculations for your San Diego home or ADU.
LRG prepares energy reports around your actual project: the scope of work, orientation, existing conditions, proposed construction, windows, and equipment. We confirm price and turnaround after reviewing the plans.
Start with the local resources.
The City of San Diego’s Information Bulletin 400 explains its ADU and JADU building-permit process. The bulletin also identifies considerations for projects in the Coastal Overlay Zone; consult the city’s current guidance for your property.
Official city resource. Review the current instructions for your property and application.
A detail to include in your email
Send the site address and reviewing jurisdiction, plus any project-specific permit guidance already received.
Before you send the plans.
Do you work on City of San Diego and county projects?
Yes. We serve California projects online. Include the reviewing jurisdiction so the City of San Diego process is not confused with the County of San Diego or another city in the county.
What should I send to get started?
For every service, send the full project address, scope of work, complete floor-area breakdowns, site plan, fully dimensioned floor plans drawn to scale with a window and door schedule or size callouts, exterior elevations of all sides, and cross sections. Include structural drawings if available; otherwise, structural member sizes used in our calculations will be estimated based on experience. Include any specified or preferred window U-factor and SHGC values, insulation R-values, HVAC size and type, and water-heater size and type. View the complete plan checklist →
Do you guarantee approval of the report?
Yes. We guarantee approval of the Title 24 report. Plan-check corrections are included when they are not caused by changes to the plans originally reviewed. Design changes may be required to achieve energy compliance and registry approval. The guarantee covers the Title 24 report, not approval of the entire project or issuance of a building permit.
ALWAYS HAPPY TO HELP
Let’s move your project forward.
Send your San Diego plans. We’ll take it from there.
Email your plans