TITLE 24 IN SANTA ANA
Title 24 energy reports
in Santa Ana.
Title 24 energy calculations for Santa Ana homes, ADUs, additions, and alterations. Email your plans for a written quote and confirmed turnaround.

Careful energy-report preparation for your Santa Ana plans.
LRG prepares energy reports around your actual project: the scope of work, orientation, existing conditions, proposed construction, windows, and equipment. We confirm price and turnaround after reviewing the plans.
Start with the local resources.
Santa Ana’s Building Safety Division is the local resource for building-review coordination. Use the city’s current application instructions alongside the plans prepared by your designer.
Official city resource. Review the current instructions for your property and application.
A detail to include in your email
Separate replacement components from items that remain unchanged on the existing building.
Before you send the plans.
Can I request an energy report for a Santa Ana home alteration?
Email the existing and proposed drawings and describe the components being changed. Include window replacements, insulation changes, equipment changes, and any new conditioned floor area.
What should I send to get started?
For every service, send the full project address, scope of work, complete floor-area breakdowns, site plan, fully dimensioned floor plans drawn to scale with a window and door schedule or size callouts, exterior elevations of all sides, and cross sections. Include structural drawings if available; otherwise, structural member sizes used in our calculations will be estimated based on experience. Include any specified or preferred window U-factor and SHGC values, insulation R-values, HVAC size and type, and water-heater size and type. View the complete plan checklist →
Do you guarantee approval of the report?
Yes. We guarantee approval of the Title 24 report. Plan-check corrections are included when they are not caused by changes to the plans originally reviewed. Design changes may be required to achieve energy compliance and registry approval. The guarantee covers the Title 24 report, not approval of the entire project or issuance of a building permit.
ALWAYS HAPPY TO HELP
Let’s move your project forward.
Send your Santa Ana plans. We’ll take it from there.
Email your plans