TITLE 24 IN GLENDALE

Title 24 energy reports
in Glendale.

Title 24 energy calculations for Glendale homes, ADUs, additions, and alterations. Email your plans for a written quote and confirmed turnaround.

Architectural concept of a Spanish Revival home with a landscaped courtyard
Architectural concept

Careful energy-report preparation for your Glendale plans.

LRG prepares energy reports around your actual project: the scope of work, orientation, existing conditions, proposed construction, windows, and equipment. We confirm price and turnaround after reviewing the plans.

Start with the local resources.

Glendale’s building-code page identifies the state code editions and local amendments applicable to city submittals. Send the application date and any project-specific direction already received.

Glendale — Building Codes ↗

Official city resource. Review the current instructions for your property and application.

A detail to include in your email

Do not omit the application history when the project began under an earlier code cycle.

Before you send the plans.

Which documents help with an older Glendale application?

Include the original application date, current plans, prior energy report, and city instructions about the applicable code cycle. We review that information before determining the report approach.

What should I send to get started?

For every service, send the full project address, scope of work, complete floor-area breakdowns, site plan, fully dimensioned floor plans drawn to scale with a window and door schedule or size callouts, exterior elevations of all sides, and cross sections. Include structural drawings if available; otherwise, structural member sizes used in our calculations will be estimated based on experience. Include any specified or preferred window U-factor and SHGC values, insulation R-values, HVAC size and type, and water-heater size and type. View the complete plan checklist →

Do you guarantee approval of the report?

Yes. We guarantee approval of the Title 24 report. Plan-check corrections are included when they are not caused by changes to the plans originally reviewed. Design changes may be required to achieve energy compliance and registry approval. The guarantee covers the Title 24 report, not approval of the entire project or issuance of a building permit.

ALWAYS HAPPY TO HELP

Let’s move your project forward.

Send your Glendale plans. We’ll take it from there.

Email your plans