TITLE 24 IN RIVERSIDE

Title 24 energy reports
in Riverside.

Title 24 calculations for Riverside ADUs, additions, and new homes, with attention to the building envelope and proposed systems.

Architectural concept of a modern duplex with separate entries
Architectural concept

A project-specific report for your Riverside ADU.

LRG prepares energy reports around your actual project: the scope of work, orientation, existing conditions, proposed construction, windows, and equipment. We confirm price and turnaround after reviewing the plans.

Start with the local resources.

The City of Riverside offers permit-ready ADU plans and instructions for the related application process. If you are using that program, send the selected plans and all project-specific changes for our review.

Riverside — Permit-Ready ADU Plans ↗

Official city resource. Review the current instructions for your property and application.

A detail to include in your email

Include the actual orientation, roof details, window selections, and HVAC specifications proposed for your site.

Before you send the plans.

Does a permit-ready plan replace my project review?

Send the complete selected plan set and any existing energy documents. We’ll review what is already included, what has changed, and what work is needed for your specific site before confirming a quote.

What should I send to get started?

For every service, send the full project address, scope of work, complete floor-area breakdowns, site plan, fully dimensioned floor plans drawn to scale with a window and door schedule or size callouts, exterior elevations of all sides, and cross sections. Include structural drawings if available; otherwise, structural member sizes used in our calculations will be estimated based on experience. Include any specified or preferred window U-factor and SHGC values, insulation R-values, HVAC size and type, and water-heater size and type. View the complete plan checklist →

Do you guarantee approval of the report?

Yes. We guarantee approval of the Title 24 report. Plan-check corrections are included when they are not caused by changes to the plans originally reviewed. Design changes may be required to achieve energy compliance and registry approval. The guarantee covers the Title 24 report, not approval of the entire project or issuance of a building permit.

ALWAYS HAPPY TO HELP

Let’s move your project forward.

Send your Riverside plans. We’ll take it from there.

Email your plans